Dates Work Completed: 9/7-9/11/10
The trim carpenters installed the stair treads and added trim in the current keeping area downstairs where stuff was removed when the stairwell was added. The laminate floors were mostly installed on Friday and Saturday. There's just a little more to be added in the playroom and where it meets the stairs.